ZelnickSignal hub
UTC --:--

Field manual / Recovered procedures

Old notes, rebuilt for the systems that exist now.

The useful parts of the former documentation site, condensed into living protocols. Recovered sources are acknowledged; obsolete certainty has been removed.

ACTIVE SIGNALCURATED / SCOPE-FIRST / REVISION EXPECTED

PROTOCOL ARRAY / 03

Procedures for the moment before action.

FM.01

2 MIN PROTOCOL

Authorised SQL injection testing

A scope-first protocol for using SQLmap as evidence-gathering equipment, not a permission slip.Curated from two recovered 2023 SQLmap notes.
FM.02

2 MIN PROTOCOL

Secure delivery lifecycle

A compact operating model for carrying requirements, security, recovery, and proof through the full life of software.Curated from three recovered SDLC policy documents.
FM.03

2 MIN PROTOCOL

Time and attention protocol

A recovered productivity note rebuilt around finite attention, deliberate refusal, and work that can actually end.Curated from two recovered productivity and personal fragments.